
Project Overview & Challenges:
The Challenge: The grand lobby required a striking focal point with a complex, topographical 3D design. The architect specified integrated ambient lighting and acoustic treatments. Executing such intricate LED channels and leather upholstery on-site would cause severe project delays and massive labor costs.
Our Solution & Materials:
The Solution & Materials: We engineered a fully pre-fabricated modular system.
- Finish: Premium leather surface for a sophisticated, easy-to-maintain luxury texture.
- Core: High-density acoustic foam (sponge) to provide sound absorption and a plush 3D profile.
- Lighting: Seamlessly integrated LED lighting channels, pre-wired and thoroughly tested in our factory.
Delivery & Impact:
The Result: By shifting the complex fabrication to our facility, we completed the manufacturing in just 3 weeks. The panels arrived on-site as “plug-and-play” modules, allowing the local fit-out team to assemble this breathtaking feature wall rapidly and flawlessly.